AI & cloud company Doha · Riyadh · Amman
Industry

Construction & Giga-Projects — governance at site scale.

Giga-projects run on thousands of decisions across owner, PMC, and contractors — with lives on the line at the site edge. Binnovy gives construction one platform: site-safety AI tiered RT1 with safety cases, one evidence ledger across every party, and program reporting that stands up nationally.

01

Site safety is RT1 — by definition.

Any AI that touches site safety — vision systems on the gate, fatigue monitoring, lift-zone clearance — enters the portfolio as RT1: a named accountable human per outcome, an oversight design that is measured, and a documented safety case before activation. The gate criteria are not negotiable on schedule pressure; that is the point.

02

One ledger across owner · PMC · contractors.

JV
Multi-party governance
Joint-venture programs run on a single evidence ledger, hash-chained and signed at write — every party signs into the same gates, the same registry, the same truth.
G
Gates that travel
Scope, baseline, and value gates bind subcontracted AI too — vendor systems enter through the same front door as everything else.
◈
Accountability that names names
RACI per decision, not per org chart — the Accountability Register holds across company lines.
03

BIM, twins, and the data contracts beneath them.

BIM models and digital twins are only as governable as their data contracts. Binnovy binds model data, sensor feeds, and schedule systems into classified data products — C-classes declared, residency set, lineage kept — so schedule-AI and claims-AI carry auditable inputs, and disputes resolve on evidence instead of opinion.

04

National programs, reportable by construction.

Giga-program reporting drops out of the ledger — portfolio status, gate history, value verdicts — in the format national programs expect. The proof is generated, not assembled the night before.

Build the site that can prove itself.