The second test nobody prepares for
Every pilot is built to pass the first test: a compelling demonstration that the capability exists. Almost none are built to pass the second — the one production actually applies. Who owns this decision? What was the baseline? Can we reconstruct any single output on demand? The pilot was never scoped to answer those, so it cannot, and it stalls.
What changes when you scope for production first
When ownership, baseline, and evidence are requirements from day one, the pilot is already production-shaped. There is no cliff between the demo and the deployment, because the demo was built to clear the bar that matters. The cost is a little less dazzle up front and a lot less death-by-stall later.